|
Acrylic Coatings Installation |
| |
|
All CTI
Products are installed by factory trained professionals.
Training includes: |
| |
-
Preparation of existing concrete
-
Crack repair
-
Troubleshooting of damaged concrete
-
Proper application of all CTI products
|
|
|
There are
three phases to a CTI installation: |
| |
|
Phase
I |
| |
-
Acid etching of the existing concrete
surface.
-
Pressure cleaning and wash.
-
Repair of structural cracks in original
concrete.
|
|
 |
|
|
|
Phase II |
| |
-
Skim coat applied.
-
Pattern development.
|
| |
|
 |
|
|
Phase III |
| |
-
Shoot coat.
-
Highlighting.
-
Seal Coat applied.
|
| |
| |
|
 |
|